This project spanned out over a couple of months to (supply and) install 5 Temperzone Rooftop Package Units.
It required a 250t crane and some tree pruning to lift 3 of the units into place on the roof of the shopping centre and due to some lifting restrictions, the crane encountered the other 2 units were dismantled with the components lifted onto the roof and carried to their specific platforms for full reassembly.
This project was carried out in stages so not to disturb the airflow throughout the shop.