The project was at TCB Building in Fortitude Valley for the ‘Beirne Lane Project’, installing 4 water cooled ducted water package units.
The Units were hung as per M02 FCU support drawings that were issued. All Pipe work was completed in copper with proper hanging fasteners and connected to existing valves. Each unit comprised of 1 x STAD valve 2 x Isolation and 1 x Strainer 1 x Solenoid isolation valve and 1 x DPS and were completed with spring mount kits and flex hoses to valves at unit. Return air plenum were fabricated and V-form filters used in each unit. Condensate drain trays were fitted to the underside of unit with insulation. Once all the installation was completed we then balance water flows to each unit.