The unit installed in this Fortitude Valley Chinatown ground floor entrance lobby was a Samsung VRF with  four of their new 360 degree round evaporators (pictured below). This particular job was completed in stages with the piping installed and pressure tested in stage one. Once the ceiling grid was installed, the evaporators then went in with the condenser placed up in the carpark. The final stage was to fit the fascia on the evaporators and commission with a centralised controller.