Our team had a fantastic time onsite at the Fantastic Furniture store in Morayfield completing the following scope of works.

  • Carry out pre commissioning check and record data.
  • Electrically isolate system tag and make safe.
  • Decommission existing units ready for removal.
  • Crane remove and dispose of 6 x existing Daikin rooftop package units in compliant manner.
  • Existing plant decks service platforms will be modified to allow adequate space for installation of new units.
  • Units will be located on existing roof top plant decks.
  • Supply and install 6 x Temperzone OPA705RKTB ECO rooftop package units.
  • Units comprise 5 x Standard hand 1 x opposite hand.
  • Units complete with wired wall controls and return air sensors.
  • Supply and install new return air filters to suit in V-Form washable type.
  • Supply and install new supply and return air duct in galvanised sheet metal.
  • Duct manufactured with internal insulation and joints sealed with weather proof capping.
  • Duct connected to the existing duct penetration.
  • Supply and install new condensate drains with serviceable P traps.
  • Commission new units and provide completion details.