Our team had a fantastic time onsite at the Fantastic Furniture store in Morayfield completing the following scope of works.
- Carry out pre commissioning check and record data.
- Electrically isolate system tag and make safe.
- Decommission existing units ready for removal.
- Crane remove and dispose of 6 x existing Daikin rooftop package units in compliant manner.
- Existing plant decks service platforms will be modified to allow adequate space for installation of new units.
- Units will be located on existing roof top plant decks.
- Supply and install 6 x Temperzone OPA705RKTB ECO rooftop package units.
- Units comprise 5 x Standard hand 1 x opposite hand.
- Units complete with wired wall controls and return air sensors.
- Supply and install new return air filters to suit in V-Form washable type.
- Supply and install new supply and return air duct in galvanised sheet metal.
- Duct manufactured with internal insulation and joints sealed with weather proof capping.
- Duct connected to the existing duct penetration.
- Supply and install new condensate drains with serviceable P traps.
- Commission new units and provide completion details.