Now this was a fun project! Our team managed the design and install for the new U-Bet Theatre development at the Gold Coast Turf Club in Bundall.

  • Design mechanical engineering of U-Bet Theatre development
  • Supply and install 5 Temperzone ECO package units
  • Supply and install 2 x MSSB in mechanical plant rooms
  • Controls incorporate economy cycle/C02 monitoring and unit control with remote monitoring via 4G
  • Units were installed on a steel frame within the ceiling void. Due to the location the units couldn’t be craned into position as usual. The units were lifted with a forklift to height then slid into position
  • All grilles were fitted as black to suit the new fitout.