A Major Construction project, our brief involved air conditioning the ground floor offices and first floor gym. Due to the open plan ceilings on the first floor we installed duct socks instead of ridged ducting as shown below.

Our team installed 2 x Mitsubishi City Multi-systems on the ground floor, 2 x ducted indoor units and 1 x cassette on the first floor plus 2 x ducted units with duct socks. Fresh air and toilet fans were also installed.